We source, coordinate and can act as custodian of the temporary test locations that let vendors focus on the project deliverable, while we provide the controlled environment that allows it to happen.
By the time a containerised power module reaches a live data centre site, the cost of a defect is measured in programme delay, crane hire, principal contractor access and the goodwill of everyone waiting on it.
We support Tier 1 contractors and manufacturers with an offsite provisioning location in close proximity to the end-user site, so their Level 2 to Level 4 testing can be completed in a controlled environment.
GWT Critical Infrastructure acts as principal contractor and custodian of the temporary offsite test location. We take responsibility for the site itself, so the vendor can concentrate on the equipment.
A power module cannot be meaningfully tested off a builder's supply. We set up temporary power arrangements sized to the project, so the equipment can be exercised under a representative load.
Temporary supply arranged to suit the equipment under test and the programme, rather than whatever happens to be available on the ground.
Load arrangements that let the vendor run capacity and functional testing at representative levels before shipment.
Constant-current DC load bank capacity for battery and rectifier system testing.
Testing runs from Level 1 through Level 5. The offsite test location covers the middle of that sequence, deliberately overlapping with what is later repeated on the installed system.
Where a project refers to a "Level 6", that is close-out and handover rather than a test level.
Where our sister company, GWT Critical Projects, holds the DC power installation scope for the project, it performs that scope at the test location under its own contract and supervision.
It then delivers its installation scope on the project site and supports the vendor through the repeated Level 4 checks. Two companies, two contracts, one continuous understanding of the equipment.
Programme teams who need the power equipment de-risked before it hits a congested construction site.
Modular and prefabricated power skids, switchrooms and battery containers destined for hyperscale and colocation projects.
Manufacturers needing local staging, load testing and functional verification ahead of an Australian site delivery.
Tell us the equipment, the location and the dates. We will scope the site, the power and the program.